The first segment of the new Highway 29 realignment is now open to traffic at Farrell Creek East.
Caption
The first segment of the new Highway 29 realignment is now open to traffic at Farrell Creek East.
Media
Image

Media Name
Holes are bored in the spillway area for the eventual installation of piles as part of the right bank foundation enhancement project. | October 2021
Caption
Holes are bored in the spillway area for the eventual installation of piles as part of the right bank foundation enhancement project. | October 2021
Media
Image

Media Name
This auger drill, nicknamed “dragon’s teeth,” is used to drill holes for the right bank foundation enhancements. | October 2021
Caption
This auger drill, nicknamed “dragon’s teeth,” is used to drill holes for the right bank foundation enhancements. | October 2021
Media
Image

Media Name
Intake units 1 and 2. | October 2021
Caption
Intake units 1 and 2. | October 2021
Media
Image

Media Name
The powerhouse operations building is nearing completion. | October 2021
Caption
The powerhouse operations building is nearing completion. | October 2021
Media
Image

Media Name
Installation of grounding rods in the spillway. A grounding grid is buried throughout the dam. | October 2021
Caption
Installation of grounding rods in the spillway. A grounding grid is buried throughout the dam. | October 2021
Media
Image

Media Name
Bridge girders lifted onto Lynx Creek bridge piers; lateral steel members installed between girders. | October 2021
Caption
Bridge girders lifted onto Lynx Creek bridge piers; lateral steel members installed between girders. | October 2021
Media
Image

Media Name
Installing reinforcing steel on the upper elbow of penstock unit 3. | October 2021
Caption
Installing reinforcing steel on the upper elbow of penstock unit 3. | October 2021
Media
Image

Media Name
View of the powerhouse, spillway and the dam and core buttress from the right bank. | October 2021
Caption
View of the powerhouse, spillway and the dam and core buttress from the right bank. | October 2021
Media
Image

Media Name
Construction progresses on the Lynx Creek bridge along Highway 29. | October 2021
Caption
Construction progresses on the Lynx Creek bridge along Highway 29. | October 2021
Media
Image

Media Name
The Highway 29 realignment under construction at Lynx Creek. | October 2021
Caption
The Highway 29 realignment under construction at Lynx Creek. | October 2021
Media
Image

Media Name
A bulldozer spreads material on the Lynx Creek Highway 29 embankment; the temporary detour is seen on the right. | October 2021
Caption
A bulldozer spreads material on the Lynx Creek Highway 29 embankment; the temporary detour is seen on the right. | October 2021
Media
Image

Media Name
Glacial till placement and insulation on the dam and core buttress is underway. | October 2021
Caption
Glacial till placement and insulation on the dam and core buttress is underway. | October 2021
Media
Image

Media Name
Work on the approach channel continues, and the dam and core buttress is nearing completion. | October 2021
Caption
Work on the approach channel continues, and the dam and core buttress is nearing completion. | October 2021
Media
Image

Media Name
The second-to-last lift of roller-compacted concrete is spread on the dam and core buttress. | October 2021
Caption
The second-to-last lift of roller-compacted concrete is spread on the dam and core buttress. | October 2021
Media
Image

Media Name
Steel girder placement at the Lynx Creek bridge along Highway 29. | October 2021
Caption
Steel girder placement at the Lynx Creek bridge along Highway 29. | October 2021
Media
Image

Media Name
The Lynx Creek bridge under construction. | October 2021
Caption
The Lynx Creek bridge under construction. | October 2021
Media
Image

Media Name
Steel girders are installed on the west abutment of the Lynx Creek bridge. | October 2021
Caption
Steel girders are installed on the west abutment of the Lynx Creek bridge. | October 2021
Media
Image

Media Name
Construction on the Farrell Creek bridge and road realignment continues along Highway 29. | October 2021
Caption
Construction on the Farrell Creek bridge and road realignment continues along Highway 29. | October 2021
Media
Image

Media Name
Panoramic view of the Highway 29 Cache Creek east road realignment and bridge foundations. | October 2021
Caption
Panoramic view of the Highway 29 Cache Creek east road realignment and bridge foundations. | October 2021
Media
Image

Media Name
Formwork is installed on the 2.4-metre-wide transition columns on the Cache Creek bridge. | October 2021
Caption
Formwork is installed on the 2.4-metre-wide transition columns on the Cache Creek bridge. | October 2021
Media
Image

Media Name
Cache Creek west bridge abutment and completed subgrade for the Highway 29 realignment. | October 2021
Caption
Cache Creek west bridge abutment and completed subgrade for the Highway 29 realignment. | October 2021
Media
Image

Media Name
The Farrell Creek east Highway 29 realignment is paved with asphalt. | October 2021
Caption
The Farrell Creek east Highway 29 realignment is paved with asphalt. | October 2021
Media
Image

Media Name
The Dry Creek highway realignment and new bridge are shown next to the existing Highway 29. | October 2021
Caption
The Dry Creek highway realignment and new bridge are shown next to the existing Highway 29. | October 2021
Media
Image

Media Name
The first concrete is placed on the Dry Creek bridge deck. | October 2021
Caption
The first concrete is placed on the Dry Creek bridge deck. | October 2021
Media
Image

Media Name
Roller-compacted concrete ramps are removed from the dam core buttress and insulation is installed on the upstream side of the buttress. | October 2021
Caption
Roller-compacted concrete ramps are removed from the dam core buttress and insulation is installed on the upstream side of the buttress. | October 2021
Media
Image

Media Name
Approach channel construction is ongoing. | October 2021
Caption
Approach channel construction is ongoing. | October 2021
Media
Image

Media Name
Capping formwork is placed and insulation is installed on the north dam buttress face and roller-compacted concrete ramp is removed. | October 2021
Caption
Capping formwork is placed and insulation is installed on the north dam buttress face and roller-compacted concrete ramp is removed. | October 2021
Media
Image

Media Name
Glacial till material is placed in the dam core trench; the partially insulated dam and core buttress is seen in the background. | October 2021
Caption
Glacial till material is placed in the dam core trench; the partially insulated dam and core buttress is seen in the background. | October 2021
Media
Image

Media Name
Aerial view of the intakes, penstocks and powerhouse. | October 2021
Caption
Aerial view of the intakes, penstocks and powerhouse. | October 2021
Media
Image

Media Name
The till conveyor transports glacial till material from the 85th Avenue Industrial Lands to site. | October 2021
Caption
The till conveyor transports glacial till material from the 85th Avenue Industrial Lands to site. | October 2021
Media
Image

Media Name
Concrete placement at the right spillway wall. | October 2021
Caption
Concrete placement at the right spillway wall. | October 2021
Media
Image

Media Name
View of the spillways headworks, inlet structures and the dam and core buttress. | October 2021
Caption
View of the spillways headworks, inlet structures and the dam and core buttress. | October 2021
Media
Image

Media Name
Penstock units 1 through 6 in varying stages of construction. | October 2021
Caption
Penstock units 1 through 6 in varying stages of construction. | October 2021
Media
Image

Media Name
Aerial of the dam construction site in fall 2021. | October 2021
Caption
Aerial of the dam construction site in fall 2021. | October 2021
Media
Image

Media Name
Aerial shot of the spillways basin and headworks, powerhouse and roller-compacted concrete dam and core buttress. | October 2021
Caption
Aerial shot of the spillways basin and headworks, powerhouse and roller-compacted concrete dam and core buttress. | October 2021
Media
Image

Media Name
Crews place an insulating layer on the dam and core buttress. | October 2021
Caption
Crews place an insulating layer on the dam and core buttress. | October 2021
Media
Image

Media Name
Workers install a girder splice plate to join two girders together on the Lynx Creek bridge along Highway 29 . | October 2021
Caption
Workers install a girder splice plate to join two girders together on the Lynx Creek bridge along Highway 29 . | October 2021
Media
Image

Media Name
The Farrell Creek east realignment on Highway 29 is open to traffic; hydro-seeding is underway along the sides. | October 2021
Caption
The Farrell Creek east realignment on Highway 29 is open to traffic; hydro-seeding is underway along the sides. | October 2021
Media
Image

Media Name
Crews place concrete on the Dry Creek bridge. | October 2021
Caption
Crews place concrete on the Dry Creek bridge. | October 2021
Media
Image

Media Name
Concrete finishing on the outside wall of the powerhouse. | October 2021
Caption
Concrete finishing on the outside wall of the powerhouse. | October 2021
Media
Image

Media Name
North facing view of the spillway headworks centre pier. | October 2021
Caption
North facing view of the spillway headworks centre pier. | October 2021
Media
Image

Media Name
Foundation enhancement drilling is ongoing in the east bay of the spillway stilling basin. | October 2021
Caption
Foundation enhancement drilling is ongoing in the east bay of the spillway stilling basin. | October 2021
Media
Image

Media Name
Piles are drilled for the right bank foundation enhancement in the stilling basin. | October 2021
Caption
Piles are drilled for the right bank foundation enhancement in the stilling basin. | October 2021
Media
Image

Media Name
Looking into a penstock opening from the transition section. | October 2021
Caption
Looking into a penstock opening from the transition section. | October 2021
Media
Image

Media Name
Formwork platform being lowered onto unit 5 penstock. | October 2021
Caption
Formwork platform being lowered onto unit 5 penstock. | October 2021
Media
Image

Media Name
Formwork platform being lowered onto unit 5 penstock. | October 2021
Caption
Formwork platform being lowered onto unit 5 penstock. | October 2021
Media
Image

Media Name
Unit 1 spiral case prepared for hydrostatic testing. | October 2021
Caption
Unit 1 spiral case prepared for hydrostatic testing. | October 2021
Media
Image

Media Name
Using a bristle blaster to prepare and paint the surface of unit 2 spiral case. | October 2021
Caption
Using a bristle blaster to prepare and paint the surface of unit 2 spiral case. | October 2021
Media
Image

Media Name
A casing boom applies concrete at penstock unit 3. | October 2021
Caption
A casing boom applies concrete at penstock unit 3. | October 2021